The gutters have been installed along the roof edge of the replacement barn.
This completes the actual structure of the barn. Likewise, the concrete has now cured enough that we can start working on the inside of the barn.
Gates will be the first priority, then the stanchions (the metal head gates) so the animals can use the manger. Hay and equipment will be moved into the structure soon.
It’s a good thing that the barn is near ready for the animals. The five bulls have been weaned and are starting to get cramped in their holding pen in the show barn. They will be happy to have space to run, graze and loaf around.
Advertisements